High voltage transmission lines between Algester and Larapinta

Eligibility - Queensland residents
Principal Petitioner:
Angela Owen-Taylor
PO Box 5097
Algester Qld 4115
Total Signatures - 1,806
Sponsoring Member: Jann Stuckey MP
Posting Date: 8/8/2007
Tabled Date: 8/8/2007
Responded By: Hon Geoff Wilson MP on 28/9/2007
TO: The Honourable the Speaker and Members of the Legislative Assembly of Queensland
The Petition of residents of the State of Queensland draws the attention of the House to the proposed connection between Algester and Larapinta electricity substations by way of high voltage transmission towers. The petitioners request the House to require Powerlink (as a State Government Owned Corporation) to install such transmission lines underground for the entire 5.5km distance between the two substations.